Walk This Way — DoD IG Reviews DCMA Contracting Officer Business Systems Deficiencies

The sufficiency and effectiveness of business systems is an essential element in the project management ecosystem.  Far beyond performance measurement of the actual effort, the sufficiency of the business systems to support the effort are essential in its success.  If the systems in place do not properly track and record the transactions behind the work being performed, the credibility of the data is called into question.  Furthermore, support and logistical systems, such as procurement, supply, and material management, contribute in a very real way, to work accomplishment.  If that spare part isn’t in-house on time, the work stops.

In catching up on reading this month, I found that the DoD Inspector General issued a report on October 1 showing that of 21 audits demonstrating business system deficiencies, contracting officer timeliness in meeting DFARS deadlines at various milestones existed in every case.  For example, in 17 of those cases Contracting Officers did not issue final determination letters within 30 days of the report as required by the DFARS.  In eight cases required withholds were not assessed.

For those of you who are unfamiliar with the six business systems assessed under DoD contractor project management, they consist of accounting, estimating, material management, purchasing, earned value management, and government property.  The greater the credibility and fidelity of these systems, the greater level of confidence that the government can have in ensuring that the data received in reporting on execution of public funds under these contracts.

To a certain extent the deadlines under the DFARS are so tightly scheduled that they fail to take into account normal delays in operations.  Forbid that the Contracting Officer may be on leave when the audit is received or is engaged in other detailed negotiations.  In recent years the contracting specialty within the government, like government in general, has been seriously understaffed, underfunded, and unsupported.  Given that oftentimes the best and the brightest soon leave government service for greener pastures in the private sector, what is often left are inexperienced and overworked (though mostly dedicated) personnel who do not have the skills or the time to engage in systems thinking in approaching noted deficiencies in these systems.

This pressure for staff reduction, even in areas that have been decimated by austerity politics, is significant.  In the report I could not help but shake my head when an Excel spreadsheet was identified as the “Contractor Business System Determination Timeline Tracking Tool.”  This reminds me of my initial assignment as a young Navy officer and my first assignment as a contract negotiator where I also performed collateral duties in building simple automated tools.  (This led to me being assigned later as the program manager of the first Navy contract and purchase order management system.) That very first system that I built, however, was tracking contract milestone deadlines.  It was done in VisiCalc and the year was 1984.

That a major procurement agency of the U.S. Department of Defense is still using a simple and ineffective spreadsheet tracking “tool” more than 30 years after my own experience is both depressing and alarming.  There is a long and winding history on why they would find themselves in this condition, but some additional training, which was the agency’s response to the IG, is not going to solve the problem.  In fact, such an approach is so ineffective it’s not even a Band-Aid.  It’s a bureaucratic function of answering the mail.

The reason why it won’t solve the problem is because there is no magic wand to get those additional contract negotiators and contracting officers in place.  The large intern program of recruiting young people from colleges to grow talent and provide people with a promising career track is long gone.  Interdisciplinary and cross-domain expertise required in today’s world to reflect the new realities when procuring products and services are not in the works.  In places where they are being attempted, outmoded personnel classification systems based on older concepts of division of labor stand in the way.

The list of systemic causes could go on, but in the end it’s not in the DCMA response because no one cares, and if they do care, they can’t do anything about it.  It’s not as if “BEST TALENT LEAVES DUE TO PUBLIC HOSTILITY TO PUBLIC SERVICE”  was a headline of any significance.  The Post under Bezos is not going to run that one anytime soon, though we’ve been living under it since 1981.  The old “thank you for your service” line for veterans has become a joke.  Those who use this line might as well say what that really means, which is: “I’m glad it was you and not me.”

The only realistic way to augment an organization in this state in order the break the cycle is to automate the system–and to do it in a way as to tie together the entire system.  When I run into my consulting friends and colleagues and they repeat the mantra: “software doesn’t matter, it’s all based on systems” I can only shake my head.  I have learned to be more tactful.

In today’s world software matters.  Try doing today what we used to do with slide rules, scientific calculators, and process charts absent software.  Compare organizations that use the old division-of-labor, “best of breed” tool concept against those who have integrated their systems and use data across domains effectively.  Now tell me again why “software doesn’t matter.”  Not only does it matter but “software” isn’t all the same.  Some “software” consists of individual apps that do one thing.  Some “software” is designed to address enterprise challenges.  Some “software” is designed not only to enterprise challenges, but also to address the maximization of value in enterprise data.

In the case of procurement and business systems assessment, the only path forward for the agency will be to apply data-driven measures to the underlying systems and tie those assessments into a systemic solution that includes the contracting officers, negotiators, administrators, contracting officer representatives, the auditors, analysts, and management.  One can see, just in writing one line, how much more complex are the requirements for the automated panacea to replace “Contractor Business System Determination Timeline Tracking Tool.”  Is there any question why the “tool” is ineffective?

If this were the 1990s, though the practice still persists, we would sit down, perform systems analysis, outline the systems and subsystem solutions, and then through various stages of project management, design the software system to reflect the actual system in place as if organizational change did not exist.  This is the process that has a 90% failure rate across government and industry.  The level of denial to this figure is so great that I run into IT managers and CIOs every day that fail to know it or, if they do, believe that it will apply to them–and these are brilliant people.  It is selection bias and optimism, with a little (or a lot) of narcissism, run amok.  The physics and math on this are so well documented that you might as well take your organization’s money and go to Vegas with it.  Your local bookie could give you better odds.

The key is risk handling (not the weasel word “management,” not “mitigation” since some risks must simply be accepted, and certainly not the unrealistic term “avoidance”), and the deployment of technology that provides at least a partial solution to the entire problem, augmented by incremental changes to incorporate each system into the overall solution. For example, DeLong and Froomkin’s seminal paper on what they called “The Next Economy” holds true today.  The lack of transparency in software technologies requires a process whereby the market is surveyed, vendors must go through a series of assessments and demonstration tests, and where the selected technology then goes through stage gates: proof-of-concept, pilot, and, eventually deployment.  Success at each level gets rewarded with proceeding to the next step.

Thus, ideally the process includes introducing into the underlying functionality the specific functionality required by the organization through Agile processes where releasable versions of the solution are delivered at the end of each sprint.  One need not be an Agile Cultist to do this.  In my previous post I referred to Neil Killick’s simple checklist for whether you are engaged in Agile.  It is the best and most succinct distillation of both the process and value inherent in Agile that I have found to date, with all of the “woo-woo” taken out.  For an agency as Byzantine as DCMA, this is really the only realistic and effective approach.

DCMA is an essential agency in DoD acquisition management, but it cannot do what it once did under a more favorable funding environment.  To be frank, it didn’t even do its job all that well when a more favorable condition was in place, though things were better.  But this is also a factor in why it finds itself in its current state.  It was punished for its transgressions, perhaps too much.  Several waves of personnel cuts, staff reductions, and domain and corporate knowledge loss on top of the general trend has created an agency in a condition of siege.  As with any organization under siege, backbiting and careerism for those few remaining is rewarded.  Iconoclasts and thought leaders stay for a while before being driven away.  They are seen as being too risky.

This does not create a condition for an agency ready to accept or quickly execute change through new technology.  What it does do is allow portions of the agency to engage in cargo cult change management.  That is, it has the appearance of change but keeps self-interest comfortable and change in its place.  Over time–several years–with the few remaining resources committed to this process, they will work the “change.”  Eventually, they may even get something tangible, though suboptimized to conform to rice bowls; preferably after management has their retirement plans secured.

Still, the reality is that DCMA must be made to do it’s job because it is in the best interests of the U.S. Department of Defense.  The panacea will not be found through “collaboration” with industry, which consists of the companies which DCMA is tasked with overseeing and regulating.  We all know how well deregulation and collaboration has worked in the financial derivatives, banking, mortgage, and stock markets.  Nor will it come from organic efforts within an understaffed and under-resourced agency that will be unable to leverage the best and latest technology solutions under the unforgiving math of organic IT failure rates.  Nor will deploying the long outmoded approach of deploying suboptimized “tools” to address a particular problem.  The proper solution is to leverage effective COTS solutions that facilitate the challenge of systems integration and thinking.

 

 

Leader of the Pack, Chapter 2 — The Mind of the Commander — Gettysburg 1863

Headquarters of the Army, Washington, DC, June 27, 1863
Major General G. G. Meade,
Army of the Potomac

General:
You will receive with this the order of the President placing you in command of the Army of the Potomac. Considering the circumstances, no one ever received a more important command; and I cannot doubt that you will fully justify the confidence which the Government has reposed in you.
You will not be hampered by any minute instructions from these headquarters. Your army is free to act as you may deem proper under the circumstances as they arise. You will, however, keep in view the important fact that the Army of the Potomac is the covering army of Washington, as well as the army of operation against the invading forces of the rebels. You will therefore manoeuvre and fight in such a manner as to cover the Capital and also Baltimore, as far as circumstances will admit. Should General Lee move upon either of these places, it is expected that you will either anticipate him or arrive with him, so as to give him battle.
All forces within the sphere of your operations will be held subject to your orders.
Harper’s Ferry and its garrison are under your direct orders.
You are authorized to remove from command and send from your army any officer or other person you may deem proper; and to appoint to command as you may deem expedient.
In fine, General, you are intrusted with all the power and authority which the President, the Secretary of War, or the General-in-Chief can confer on you, and you may rely on our full support.
You will keep me fully informed of your movements and the positions of your own troops and those of the enemy, so far as known.
I shall always be ready to advise and assist you to the utmost of my ability.
Very respectfully,
Your obedient servant,
H. W. Halleck
General-in-Chief

Frederick, Md., 7 a.m., June 28, 1863
H. W. Halleck,
General-in-Chief:
The order placing me in command of this army is received. As a soldier I obey it, and to the utmost of my ability will execute it. Totally unexpected as it has been, and in ignorance of the exact condition of the troops and position of the enemy, I can only now say that it appears to me I must move towards the Susqehanna, keeping Washington and Baltimore well covered, and if the enemy is checked in his attempt to cross the Susquehanna, or if he turns towards Baltimore, to give him battle. I would say that I trust that every available man that can be spared will be sent to me, as from all accounts, the enemy is in a strong force. So soon as I can post myself up I will communicate more in detail.
General G. Meade,
Major General

Headquarters Army of the Potomac, June 30, 1863.
Circular:
The Commanding General has received information that the enemy are advancing, probably in strong force, on Gettysburg. It is the intention to hold this army pretty nearly in the position it now occupies, until the plans of the enemy shall have been more fully developed.
Three corps, 1st, 3d, and 11th, are under the command of Major General Reynolds, in the vicinity of Emmettsburg, the 3d Corps being ordered up to that point. The 12th Corps is at Littlestown. General Gregg’s division of cavalry is believed to be now engaged with the cavalry of the enemy, near Hanover Junction.
Corps commanders will hold their commands in readiness at a moment’s notice, and upon receiving orders, to march against the enemy. Their trains (ammunition trains excepted) must be parked in the rear of the place of concentration. Ammunition wagons and ambulances will alone be permitted to accompany the troops. The men must be provided with three-days’ rations in haversacks and with sixty rounds of ammunition in boxes and upon the person.
Corps commanders will avail themselves of all the time at their disposal to familiarize themselves with the roads communicating with the different corps.
By command Major General Meade.
S. Williams
Asst. Adjt. Gen’l

Headquarters Army of the Potomac, June 30, 1863.
Circular:
The Commanding General requests that, previous to the engagement soon expected with the enemy, corps and all other commanding officers address their troops, explaining to them briefly the immense issues involved in the struggle. The enemy are on our soil; the whole country now looks anxiously to this army to deliver it from the presence of the foe. Our failure to do so will leave us no such welcome as the swelling of millions of hearts with pride and joy, as our success would give to every soldier of this army. Homes, firesides and domestic altars are involved. The army has fought well heretofore; it is believed that it will fight more desperately and bravely than ever, if it is addressed in fitting terms.
Corps and other commanders are authorized to order the instant death of any soldier who fails in his duty at this hour.
By command Major General Meade,
S. Williams
Asst. Adjt. Gen’l

July 1, 1863
Commanding Officer Sixth Corps:
I am directed by the Commanding General to state that it would appear from reports received, that the enemy is moving in heavy force on Gettysburg (Ewell from Heidlersburg, and Hill from Cashtown Pass), and it is not improbable he will reach that place before the command under Major General Reynolds (the First and Eleventh Corps), now on the way, can arrive there. Should such be the case, and General Reynolds finds himself in the presence of a superior force, he is instructed to hold the enemy in check, and fall slowly back. If he is able to do this, the line indicated in the circular of to-day will be occupied to-night. Should circumstances render it necessary for the Commanding General to fight the enemy to-day, the troops are posted as follows for the support of Reynold’s command, viz.: On his right, at “Two Tavers,” the Twelfth Corps; at Hanover, the Fifth Corps; the Second Corps is on the road between Taneytown and Gettysburg; the Third Corps is at Emmetsburg.
This information is conveyed to you, that you may have your Corps in readiness to move in such direction as may be required at a moment’s notice.
Very respectfully, etc.,
S. Williams,
Asst. Adjt. Gen’l

Verbal communications from Major General Reynolds conveyed to Major General Meade via Captain Stephen M. Weed, aide-de-camp:

“Ride at your utmost speed to General Meade. Tell him the enemy are advancing in strong force, and that I fear they will get to the heights beyond the town before I can. I will fight them inch by inch, and if driven into the town, I will barricade the streets and hold them back as long as possible. Don’t spare your horse—never mind if you kill him.”